Skip to main content

Posts

Hybrid Engine

Graeme Hawksley has brought the engine package today.


Recent posts

Ballast

The boat has been ballasted with 40 blocks in each bay arranged slightly to the starboard side to accommodate a fit-out favoured to portside.

Sprayfoam

The sprayfoam insulation has been applied and we're starting to cut it back.



Battening out

Nic has finished the battening out ready for sprayfoam insulation.






Interior

Some photos of the interior of the steelwork.







The finished boat

Outside in the sunshine.




The bow area

Here is the bow enclosed cratch area under construction.