Skip to main content

Posts

Showing posts from January, 2019

12 volt cupboard

We are installing the engine electrics on starboard sided and have installed a panel which is 600mm wide on the upper wall here. This would usually be inside a cupboard once the boat is fitted out.

Stern bands

Matt is doing the final touches including the tunnel bands.

Hybrid battery bank

Ecobat have delivered and installed the 48 volt batteries.

Subfloor

The subfloor is down with insulating film beneath it.

Coachlines