Skip to main content

Posts

Showing posts from 2018

The first glimpse of duck egg

The top coat is going on. Its a lovely unusual colour.

Boat prepped for top coat

Penguard primer

The boat has now had all of her priming coats, this is the Penguard primer on the topsides.

Jotmastic, black and grey

The black Jotmastic on the hull has been masked up and the grey layer has been sprayed on the topsides and in the engine compartment.

New cratch window cutout

Painting the boat

We're getting ready to paint the exterior of the boat, a dark duck egg blue (RAL 6033 'Mint turquiose') with cream coachlines. She will be moving into the paint workshop soon.

The engine

Here is the engine, delivered by Graeme Hawksley on Thursday.

Sprayfoam

The sprayfoam insulation has been applied and we're starting to cut it back.

Battening out

Nic has finished the battening out ready for sprayfoam insulation.

Interior

Some photos of the interior of the steelwork.

The finished boat

Outside in the sunshine.

The bow area

Here is the bow enclosed cratch area under construction.

Stern seating

Here is one of the stern deck lockers/seating.

Topsides on

The cabin sides and roof are on the boat now.

Windows

SVSB have cut the window and porthole apertures. Most of them will be left in until after gritblasting, but the fwd porthole blank will be taken out now.

Stern deck

Here is the dropped side of the stern deck which will make access easier.

Roof

Here is the partially constructed roof ready to go on and the bulkheads going into position.

Sliding hatch

We're making an extended sliding hatch to give opportunity for fitting a wheelchair lift in the future. The hatch has to give clearance over the hybrid battery box.

Steel seating on aft deck

Gio is constructing the aft seating which will tie in with the pedestal.

Battery box

The hybrid battery box is constructed.

Rubbing strake

Here is the bow rubbing strake going on.

Thinking about the exterior

Here are the swatches which could inspire the exterior paintwork. Mock-up to follow.

Swim tank in

Gio has been working on the swim today.