Skip to main content

Posts

Test drive

The test drive went well yesterday.
Recent posts

Nancy David on the water

12 volt cupboard

We are installing the engine electrics on starboard sided and have installed a panel which is 600mm wide on the upper wall here. This would usually be inside a cupboard once the boat is fitted out.

Stern bands

Matt is doing the final touches including the tunnel bands.